By Nigel Sampson | Project Co-ordinator
Paul and his trainees have managed to obtain some paid work making Nursery Tables. In the picture above, one of the trainees (Kennedy) is working on the table legs. In the picture below, you can see another trainee, Steven, painting the table tops. They’ll be drying quickly with daytime temperatures up at 30°+.
In the meantime, the production of lockers continues. Below you can see Kennedy varnishing them.
The workshop has a “long drop” toilet for use by the trainees as well as by Steven who lives onsite as the caretaker/nightwatchman. It’s a tight squeeze getting the truck in to empty the toilet once every few years, but it’s a very necessary job and another expense for the workshop to meet.
In the picture below, you can see that Kennedy has got his bike out of the way so that it’s not damaged. He travels 5 miles each day each way on that bike and without it he would have to go back to walking.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.




