By John McHenry | Project Manager
In our last report, we noted that BRE completed the solar panel installation and checkout. After checkout, the system was powered down pending installation of a "smart meter" by the Belize Power company.
I am pleased to report that BEL completed smart-meter installation on Oct 28, and the system was powered on for routine electricity generation! The system has now been operational for two months, and we are in the process of analyzing our power bills to determine how much offset (against the total school power requirements) will be provided. In the next report, I will post our four month analysis, which should be enough data to close out this "Phase 1" project and begin a "Phase 2" project.
The images included with this report document the project success over the last two months.
Because the system has independent micro-inverters, additional build-out can austensibly be done one panel at a time.Phase 2 will ramp up towards a maximum-potential offset as determined by a daylight-only (without any storage capacity at present) PVC system.
Once again, we are extremely excited to reach this point in our Phase 1 project, and are deeply thankful to our many supporters for making this possible on behalf of the children at Holy Cross Anglican School.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.
Support this important cause by creating a personalized fundraising page.
Start a Fundraiser