By VERITE | CORDINATOR
Implementing Organization: VEFA Foundation
Target Area: Masisi Territory, North Kivu (DRC)
1. Background and Rationale
In many rural areas of Masisi, access to a reliable energy source remains a major challenge. Villages located near waterfalls have strong hydropower potential, yet they still live without electricity. This situation slows rural development, limits the functioning of health facilities, weakens agricultural activities, and exposes communities to nighttime insecurity.
The lack of electricity is not only a technical issue; it directly affects quality of life, safety, health, and economic opportunities for families.
2. Problem Statement
The absence of stable energy in rural Masisi leads to:
Without a sustainable solution, these communities will remain marginalized despite their natural resources.
3. Project Objective
This project aims to build two micro-hydroelectric plants with a total capacity of 20 kW, providing clean, reliable, and sustainable electricity to rural communities in Masisi.
Specific objectives include:
4. Project Description
The project will install two pico-hydropower units using local waterfalls. This technology is well suited to rural contexts, offering continuous energy production with minimal environmental impact.
At the same time, VEFA Foundation is currently in the process of identifying trainers and trainees to ensure local capacity building and sustainable management of the facilities. Communities will be involved from the outset, promoting ownership and long-term sustainability.
5. Expected Results
6. Long-Term Impact
This project will have a lasting impact by turning energy access into a driver of local development. Electricity will enable communities in Masisi to access better healthcare, work more efficiently, and plan for the future with greater stability and dignity.
7. Budget and Funding Status
Through the collaboration with GlobalGiving, VEFA Foundation is confident in reaching this financial goal. This partnership offers strong international visibility, transparency, and effective resource mobilization for the benefit of local communities.
8. Partnerships and Accountability
VEFA Foundation is committed to transparent, participatory, and accountable project management. The partnership with GlobalGiving strengthens the project’s credibility and ensures donor confidence throughout implementation.
9. Call to Action for Donors
We make a strong and heartfelt appeal to donors, partners, and all people of goodwill to support this high-impact project. Every contribution, regardless of size, brings light, safety, and opportunity to entire villages in Masisi.
Your support today means light, security, and hope tomorrow.
10. Acknowledgements
VEFA Foundation sincerely thanks all individuals and organizations who have already expressed interest and support. Your trust and solidarity are invaluable. Together, with the support of GlobalGiving, we firmly believe this goal will be achieved and that Masisi will shine with new energy.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.
Support this important cause by creating a personalized fundraising page.
Start a Fundraiser