By Nachum Bloch | School Principal
Dear friends,
We typically report our activities with the children. We chose this time to share with you the changes we were able to make to our facility.
At the begining of the school year in September, our school has expanded into a new adjacent building. This building was of a school that stopped operating. The facility was old an not well maintained, and with the help of good people like you that donated, we were able to make the building into a great school facility. Please check the pictures to see how far we've come.
The work with kid of special needs comes from love and dedication. At times it can be challenging and demanding. We believe that having the new facility will help a lot in overcoming some of the daily challenges that the teaching team faces.
Liat Simchi, a decorator has volenteered to help with the new facility design. We re-built the school entrance, the teachers room, the corridors and even built a new outside shade.
We like to thank all the great people that gave us our time and energy and volunteed to help us with the change we made to our facility,
We which you all a happy new year and health.
Sincerly,
Nachum Bloch
School principle
Links:
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.
Support this important cause by creating a personalized fundraising page.
Start a Fundraiser






