By R.BALU | DIRECTOR
BOSS held consultations with Stakeholders / Representative groups of the people in the 10 Dalit villages and this project is the result of such consultations. The details of the project are:
One bore well with hand pump has to be installed in each of the 10 project villages with protective platform around the bore wells.
3 local dowsers will identify the sites who uses a stick of the Neem tree and wrist watch to identify the water source
The sites chosen would be in public places easily accessible to the beneficiary communities and they would have the necessary sanction from the local village panchayat administration.
The project shall be carried with people’s participation and their contribution in the form of manual labor.
After installation the bore wells would be handed over to the local panchayat administration that would undertake repair works / changing of worn out parts as and when needed. An undertaking to this effect would be obtained from the local panchayat presidents of the 10 project villages.
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.
Support this important cause by creating a personalized fundraising page.
Start a Fundraiser