Although our Computer Lab is not quite finished, it is far along enough to put to use. All that is lacking is the ceramic flooring, windows, electrical installation and internal partitions. Even as it is, it´s a great place for meetings and group activity. It is our most spacious building, cool during the day and well lit.
It has now become the place for music lessons, games and recreation. Parent meetings take place in the new Computer Lab, with plenty of room for interaction and presentations. When inside work is completed, computers will be installed.
Since our last report, the roofing has been finished, the screens built and installed and the doors have been built on site and installed. The stucco has been finished inside with one outside wall to be completed. We did add a few items not contemplated within the original project, such as a surface-water drainage and the outside landing and sidewalk for the entrance.
We have gone over budget, as we mentioned in the last report, but are putting together a top quality building that will be in service for many years to come. We will itemize these details in the next report along with a revised budget.
Links:
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can recieve an email when this project posts a report. You can also subscribe for reports without donating.