By Daran Rehmeyer | Executive Director
The power situation in Eswatini continues to deteriorate and become more fragile. Eswatini imports almost ¾ of its electricity from neighboring South Africa. South Africa continues to experience sever load shedding (Level 6 just last week) because of insufficient capacity and generation problems.
Unfortunately, the health needs of the communities we serve do not depend upon electricity availability. So besides saving the clinic money by installing a grid tie system, we will also be contributing (albeit in a small way) to the stability of the regions electricity grid.
An additional motivation to contribute now to the system installation is the current exchange rate as it hovers around 17:1. At this rate we really only need about $11000 to complete the initial installation.
Any help towards this goal will help the outreach as well as the region.
Links:
Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.
If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.
Support this important cause by creating a personalized fundraising page.
Start a Fundraiser

