Project Report | Jan 22, 2024
FINAL REPORT FORAGES-KARA PROJECT 2023

By GBELE-GUEWE Djobo Ousmane | Coordinator

INTRODUCTION

The project to support the construction of two (2) human-powered boreholes in the communities of Kôbôô and Koudjoma 2, respectively in the prefectures of Assoli and Bassar in Togo, began on November 28, 2023 with the stage of awareness raising and ended on December 31, 2023 with the installation of the Koudjoma hand pump. It is implemented by the NGO CAV with the financial support of the COCH Family through GlobalGiving.

This document is the final report of the activities of the said project. These are the following activities carried out during the period:

-       Raising public awareness of the project and setting up drilling sites ;

-       Carrying out geophysical studies;

-       Drilling of wells;

-       Pumping and water analysis;

-       Construction of superstructures;

-       Supply and installation of mechanical pumps with human power in the 2 localities;

-       Technical and provisional reception in the 2 locations;

-       Monitoring and supervision of project activities.

 

I – NARRATIVE REPORT

1.1. - Population awareness about the project and implementation of drilling sites:

The technical team of the project with the technical support of an agent from the Regional Directorate of Hydraulics toured the two (2) localities benefiting from the projects for the awareness-raising stage.

These awareness campaigns took place on November 28 and 29, 2023, respectively in Kôbôô and Koudjoma 2.

During these awareness sessions, the beneficiaries were equipped with their responsibilities to now take charge of the management and maintenance of the works to be built.

An area of at least a quarter of a hectare was chosen by each community for geophysical studies. This space that was chosen is the one belonging to the entire community or space donated by the community or landowners with proof of ownership of the site.

1.2. - Geophysical studies:

Surveys or geophysical studies were carried out on the sites chosen by the communities. These studies revealed the existence of abundant water tables between 75 and 120 meters deep.

These geophysical studies took place on the same dates as the awareness campaigns in the beneficiary communities.

1.3. - Drillings, development, drilling equipment and water pumping

The drilling and development work took place on November 29 in Kôbôô and on December 1, 2023 in Koudjoma 2. This work was successfully carried out in the 2 communities.

After drilling and development, it is essential to carry out pumping in order to measure the flow rate of the drilling, quantify the characteristics of the aquifer, in particular the transmissivity, the permeability coefficient and the storage capacity.

Pumping was carried out on December 7 and 8, 2023 respectively in Kôbôô and Koudjoma 2.

1.4. - Physico-chemical and microbiological analyzes of drill water:

At the end of the pumping, water samples were taken for physicochemical and bacteriological analyzes in the laboratory at the Regional Directorate of Hygiene and Sanitation.

The analyzes were carried out from December 7 to 11, 2023 and were considered satisfactory.

1.5. - Construction of superstructures

The making of the bricks was carried out on December 7 at the same time as the pumping in Kôbôô. The superstructure was built from December 15 to 18, 2023. At Koudjoma II, it was built from December 20 to 24, 2023.

 

1.6. - Supply and installation of mechanical human power pumps in the 2 localities

 

The pump installations were carried out on December 25 and 26, 2023, respectively in Kôbôô and Koudjoma, putting an end to the work in the 2 project locations.

Communities were recommended to use the structures intensively in order to appreciate their functionality.

 

1.7. - Technical and provisional reception in the 2 localities 

 

The provisional reception took place on Thursday, January 11, 2024 in the morning at 10 a.m. at Koudjoma II and in the afternoon at 4 p.m. at Kôbôô.

The local authorities accompanied the NGO CAV team to the project locations. These include the Deputy Mayors of the Communes Bassar III and Assoli I. They expressed, on behalf of the beneficiary populations, their satisfaction and thanks to the financial partner and the NGO CAV.
For Mr. NAG MASS , Deputy Mayor of the Bassar 3 Commune, “I served in Koudjoma 1 as a school director. At the time, to find water, women were forced to go to the rivers around the village. It was with the hand that we scraped in the sand to find water. Today, the problem of fetching water in Koudjoma II is over. Women and children will no longer go into the backwaters in search of water. The children have time to go to school. Please convey to the COCHRAN Family all the gratitude of the Mayor of the Commune Bassar III. May the Lord bless the COCHRAN Family.”

For his part, Mr. HASS ABOUBA , Deputy Mayor of Commune Assoli 1, thanked the COCHRAN Family very sincerely for its financial support. “Only God can reward the NGO CAV and its Partner, for this jewel which relieves the suffering of the population of Kôbôô”. He then gave extensive advice to the population and urged them to set up a local fund to collect funds to be used to repair possible drilling breakdowns.

Some sister NGOs of RESOKA (Kara NGO Network), notably the NGO TIBI based in Bafilo accompanied and supported the NGO CAV throughout the implementation of the project in the prefecture of Assoli.

An appointment has been made with the communities and the company in charge of the project in six (6) months, i.e. in June 2024, for the final reception of the two (2) structures.

1.8 - Coordination and monitoring of project activities.

All planned activities were carried out under the coordination and effective monitoring of the technical project team, made up of the Technical Monitoring Officer, the NGO Coordinator and the Director of the company in charge of the projects. Work monitoring tours from drilling to technical reception of the works were organized during the implementation of the project. Telephone, email and Whatsapp contacts were exchanged between the project team, the company and the project technical monitoring manager.

Work monitoring and control reports were regularly drawn up and shared with project stakeholders, including the financial partner.

 

II – FINANCIAL REPORT

 

As part of the implementation of the “ Improveaccess to water for the communities of Koboo (Bafilo) in the prefecture of Assoli and Koudjoma II (Kabou) in the prefecture of Bassar, the NGO CAV mobilized a significant grant from the COCHRAN Family through by GlobalGiving

This report is the financial statement of all activities carried out as part of the implementation of this project. He understands :

-          Funding received;

-          The NGO's banking journal and;

-          Budget execution.

 

2.1. - Financing received 

The total amount of the grant is 16,289,900 F CFA, or US$ [1]27,424. This grant is distributed as follows:

  • Human-powered drilling in the 2 localities for a cost of 14,200,000 CFA francs or 23,906 US$, or 87% of the funding.
  • Operating expenses for the NGO CAV amounting to 2,089,900 F CFA, or US$ 3,518, or 13% of the funding.

2.2. - The bank journal 

 

The total amount of expenses incurred amounts to 16,289,900 CFA francs including:

  • The cost of financing the drilling is 14,200,000 CFA francs ;
  • The operating expenses of the NGO CAV at 2,089,900 F CFA

2.3. - Execution of the budget

The overall achievement rate is 100%.

The budgetary assessment data is summarized in the table below.

 

[1]1US$ = 594 F CFA


Attachments: Share on Twitter Share on Facebook

About Project Reports

Project reports on GlobalGiving are posted directly to globalgiving.org by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

If you donate to this project or have donated to this project, you can receive an email when this project posts a report. You can also subscribe for reports without donating.

Sign up for updates

Organization Information

Club des Amis du Village

Location: SOKODE, REGION CENTRALE / TOGO - Togo
Website:
Facebook: Facebook Page
X / Twitter: Profile
Project Leader:
Djobo GBELE-GUEWE
SOKODE , REGION CENTRALE / TOGO Togo

Funded Project!

Combined with other sources of funding, this project raised enough money to fund the outlined activities and is no longer accepting donations.
   

Still want to help?

Support another project run by Club des Amis du Village that needs your help, such as:

Find a Project

Learn more about GlobalGiving

Teenage Science Students
Vetting +
Due Diligence

Snorkeler
Our
Impact

Woman Holding a Gift Card
Give
Gift Cards

Young Girl with a Bicycle
GlobalGiving
Guarantee

Get incredible stories, promotions, and matching offers in your inbox

WARNING: Javascript is currently disabled or is not available in your browser. GlobalGiving makes extensive use of Javascript and will not function properly with Javascript disabled. Please enable Javascript and refresh this page.