Report name for this project: Locative Areas
By ADRIANA PAVIA | SOCIAL MANAGER
![]()
Over the past three months, we have continued maintaining the foundation’s facilities, including garden work and painting. We also replaced the children’s bedsheets and towels.
At this time, due to heavy rainfall, we need to work on the entrance to the foundation, making improvements so that heavy vehicles delivering food and other materials can enter safely.
We are also developing a project to receive donations of used clothing in good condition to sell to the community at very low prices. This will allow us to generate a small additional income to support our work. However, support from GlobalGiving is very important to us, and these donations are essential for our organization.
Sep 30, 2025
Improvements in the Facilities
By ADRIANA PAVIA | SOCIAL MANAGER
![]()
Good afternoon to all our donors, and above all, thank you. Over the past three months, at the foundation, in our efforts to keep our facilities in the best condition for the children, we have worked on all the gardens and trimmed the grass.
In the meeting house where the children gather with their families, we have completely repainted it, and on the walls we created drawings that represent family and well-being.
Likewise, in the kitchen we have improved the entire process of organizing the pantry where all the food is stored.
We are also working on the entrance, which needs to be rebuilt with a reinforced concrete slab because it is sinking. This is a major engineering project, and we are currently raising funds to complete it.
May 31, 2025
Safe spaces for children under protection in Colom
By ADRIANA PAVIA | SOCIAL MANAGER
![]()
80 children under protection reside at Fundación CRAN each year while efforts are made to restore their right to have a loving and caring family.
Our goal is to provide them with a safe and welcoming environment where they can live temporarily while their legal situation is resolved, ensuring their well-being and comprehensive development.
Activities / Components
-
Access to supplies and services: Improvement and repair of the internal road leading to the kitchen, pantry, and laundry areas.
-
Playground and recreational area: Replacement and upgrade of playground equipment that has reached the end of its useful life.
-
Room maintenance
-
Renovation of bed equipment: 18 cribs and 50 beds to be made available
Resources
Technical specifications of the interventions:
A. Modifications and repairs
B. Wooden roof, wooden platform, access netting, access stairs, a swing section, and a four-piece slide
C. Wall and window repairs and painting
D. 45 sets of sheets, mattress protectors, and pillows; 30 sleeping mats
Thanks to you, we have been able to reach some of our goals. However, we still have a long way to go to fully meet the needs of the children. Thank you very much.